Dixon Road Culvert Rehabilitation

August 9, 2017

Chazen assisted the Town with evaluation of a deteriorating 84″ CMP culvert conveying Halfway Brook, a trout stream, under Dixon Road. Chazen designed the replacement culvert to include a riffle design to reduce stream velocity and thus facilitating trout movement. Chazen also provided construction administration and observation services.