Long Beach Central School District

August 2, 2017

Chazen provided Long Beach Central School District with engineering services for modernization of the high school campus and athletic facilities. Chazen assisted the District with design of a new vehicle circulation, parking designations for various users and bus routing. The existing arrangement of roadways and walkways was altered to increase safety by limiting access between buildings to bus only, transforming the area into a ‘pedestrian mall’ during school hours. Chazen also collaborated on the athletic field designs to create a new synthetic turf field for lacrosse, soccer and football. Athletic improvements at the high school also included softball and baseball fields, a practice field, handball and tennis courts. Chazen had primary design responsibility for stormwater management facilities, utilities, erosion and sediment control and pavement surfaces, with shared design responsibilities for landscaping, courtyard design and site amenities.