Chazen surveyed a portion of the 150-mile Edic to Pleasant Valley Transmission Line. The survey included 22 miles of transmission line from the Dutchess County -Columbia County Line to the Con Edison Substation in Pleasant Valley. Chazen’s services included land records research, desktop mapping, field survey including GPS control and conventional terrestrial traverse, right-of-way and easement determination, and identification of easement deficiencies and mapping. Chazen also coordinated utility designating along the route as an Iroquois Transmission gas pipeline occupied space within the corridor.