National Grid Transco Survey

August 9, 2017

Chazen surveyed a portion of the 150-mile Edic to Pleasant Valley Transmission Line. The survey included 22 miles of transmission line from the Dutchess County -Columbia County Line to the Con Edison Substation in Pleasant Valley. Chazen’s services included land records research, desktop mapping, field survey including GPS control and conventional terrestrial traverse, right-of-way and easement determination, and identification of easement deficiencies and mapping. Chazen also coordinated utility designating along the route as the Iroquois Transmission gas pipeline also occupied space within the corridor.