Office of Children and Family Services

August 9, 2017

This project includes the relocation of the existing secure perimeter fence at the Industry Secure Center as well as the construction of a six-bay maintenance garage, new access road, grading and drainage. The fence relocation will allow the existing fuel islands and the facility maintenance operations to be outside of the secure perimeter. Field investigations advanced during the design phase included utility markout, soil testing for stormwater design, hazardous materials investigations, survey, SEQR and EAF coordination. Ecological staff also made a site visit to review ecological and wetland concerns, and were able to provide recommendations associated with trees that would need to be removed as they related to endangered bat species. Chazen advanced the project through the Program Phase, 100% Submission and Final Submission phases. The design included a detailed sequence of construction such that the secure perimeter would not be impacted during construction activities.