South Beach Psychiatric Center

July 17, 2017
South Beach Psychiatric Center

Chazen performed code compliance reviews of the 40,000-square foot Central Services Building that was constructed through a design-build contract at the South Beach Psychiatric Facility. The scope of work included plan review of civil/site, structural, architectural, mechanical, electrical, plumbing, life safety and fire protection systems. Chazen worked directly with the Client and the design team on code evaluations and resolution of issues pertaining to codes and regulatory requirements. Chazen also performed construction phase services including inspection, resolution of code issues, review of change orders and oversight of commissioning.