Hamburgh Street Sewer District

August 9, 2017

Chazen provided engineering services for the installation of sanitary sewer infrastructure along Hamburg Street. The scope of work for the project included the preparation of a map, plan and report, an engineering study, plans and specifications, and construction inspection services. The project included approximately 6,700 linear feet of 12-inch diameter gravity sewers, 4,700 linear feet of 6-inch diameter force main (including the crossing of an existing CSX railway), and a pump station with average daily flows of 49,000 gallons per day.