AMETEK Rotron

August 9, 2017
AMETEK

Chazen negotiated terms for a State Facility permit for an industrial facility using individually-vented work stations, paint booths, boilers, evaporators and cleaning vessels. Chazen provided monthly emission estimates and annual reporting, responded to periodic NYSDEC site visits, and updated the permit multiple times based on facility operational changes. Chazen also evaluated wastewater treatment programs and provided a wide range of safety training, waste minimization, Indoor Air Quality assessments, and Petroleum Bulk Storage management matters.

Zumtobel

August 7, 2017

Chazen helped the lighting manufacturer prepare for ISO 14001 Environmental Management System (EMS) certification includes conducting an EMS gap analysis and legislative review. Chazen helped resolve status of former USTs, evaluated present petroleum volumes relative to PBS registration and SPCC filing requirements, resolved multi-sector general permit industrial stormwater obligations, and assisted with reducing air permit obligations from a State Facility permit to a simple Air Registration based on review of new Part 201 Exempt and Trivial emissions options. As part … Continue reading “Zumtobel”

Tech Meadows Industrial Park

Chazen assisted the City of Glens Falls with the creation of a 46-acre ‘Shovel Ready’ industrial park located along I-87 in the Town of Queensbury. The City of Glens Falls in cooperation with the Town of Queensbury secured funds from the Build NOW NY program for planning, permitting, and infrastructure design. The project site is located adjacent to several Brownfield sites including a state-owned PCB disposal site/containment cell and the former municipal solid waste landfill. Chazen worked with representatives from … Continue reading “Tech Meadows Industrial Park”

Hudson Wire Mill – Remediation

Chazen performed an environmental study of a former Wire Mill which was purchased to rehabilitate the facility for reuse as an indoor storage space. The focus of the study was to determine whether those compounds presented a risk of degraded environmental conditions and to users of the facility. The goal was to determine a way to allow reuse of the facility and mitigate the environmental problems to the extent practical, given the regional conditions and future use of the facility. … Continue reading “Hudson Wire Mill – Remediation”

GLOBALFOUNDRIES Fab8

July 17, 2017
GLOBALFOUNDRIES FAB8

Since 2009 Chazen has performed continuous code compliance services on behalf of the Town of Malta for the development of the GLOBALFOUNDRIES Fab8 project. To date, this project has included the design and construction of a state-of-the-art semiconductor manufacturing plant which includes of 1.7M square feet of building space, a 221,000-square foot administration building, a 535,000-square foot Technology Development Center and over a dozen support structures. As full service code consultants, Chazen is responsible for code reviews of design documents, … Continue reading “GLOBALFOUNDRIES Fab8”

Revere Smelting & Refining Corporation

June 27, 2017
RSR Corporate Plant

Chazen provided structural and geotechnical engineering services, including design and construction documents as well as project management, for a $50M plant upgrade and expansion. The project includes a new pre-engineered metal building housing state-of-the-art refining processes, a containment area slab, 120-foot tall stack and tower, equipment bridges, catwalks, sampling platforms, storage tanks, a cooling tower and generator all supported by a deep foundation system and framed slab on grade. The framed slab on grade supports all plant operations including a … Continue reading “Revere Smelting & Refining Corporation”